Projects
Our case studies and projects provide an inside look at how our products and solutions have been used to meet diverse customer needs.
Our case studies and projects provide an inside look at how our products and solutions have been used to meet diverse customer needs.
Great projects for great customers
The projects below are just a few examples of how Belimed’s relentless pursuit of excellence in engineering, sustainability and quality give our customers peace of mind and empower them to meet their goals. Take a few minutes to explore the topics below and see how our solutions can give you the peace of mind to meet your reprocessing goals. Read our examples from sterile processing thought leaders at Belimed, as well as equipment-specific publications.
ProServ Instruments
An innovative off-site CSSD setting new standards in hygiene, efficiency and economy.
READ MORE
Colchester Hospital
This district general hospital located in Colchester, UK is managed by East Suffolk and North Essex NHS Foundation Trust.
READ MORE
How to take the headache out of rising utility costs
Stanford Hospital is saving over 12 million gallons of water annually, playing a key role in community water savings.
READ MORE
Maximizing Productivity with Belimed Protect Cleaning Solutions
Maximizing Productivity with Belimed Protect Cleaning Solutions
READ MORE
The need of simulation when designing a CSSD
How simulation can help you cope with increasing surgical demands.
READ MORE
Uruguay’s First Independent CSSD
GoMedical recycles all water from sterilization equipment. They have installed various Belimed equipment, which has led to materials being processed more rapidly.
READ MORE
Yeovil District Hospital Project
The Unforeseen Heights of Somerset’s Yeovil District Hospital Project
READ MORE
Linz’s Kepler University Hospital Leap into the Future
Linz’s Kepler University Hospital Leap into the Future
READ MORE